|
Barmenia insurance company, head office, Wuppertal
future without a risk
Extension, alteration and redevelopment of the head office of 'Barmenia' insurance company in Wuppertal
Barmenia's dynamic business development requires additional workplaces and extended training facilities for employees. Some single buildings of the administrative centre at the traditional location needed asbestos abatement.
In the first project phase, DU synchronised the user requirements and basic conditions, budget, cost and existing technical facilities. The cost targets, resulting from the economic considerations made on this, had already to be adhered to during the architect’s creation of the master plan. The specified user demand was realised in the conceptual planning. The pre-determined upper budget limit will be maintained.
In the first construction phase, two office blocks and two connection buildings, providing training facilities, canteen and a print office, will be constructed after asbestos abatement and partial dismantling of existing buildings. The already planned and permitted extension with a third office block, including a management division, will be realised in the second construction stage to make the ensemble complete.
at a glance
|  |


|